Utex New Energy to build a 20 GWh battery storage plant in Nagpur with ENcore Systems, KUKA robotics and SAP-linked MES, starting at 5.5 GWh in phase one.
Battery Energy Storage
Asia-Pacific
Power
12 October 2026
3 min read
Research Desk
Utex New Energy, a company belonging to the Pagariya Group, has committed to building a battery energy storage system assembly plant in Nagpur, Maharashtra, with a planned annual capacity of 20 GWh.
According to the company, the project will unfold in two phases. Initial production will stand at 5.5 GWh per year, with capacity scaling to the full 20 GWh over a period of one to two years.
The staged rollout gives the facility time to establish its baseline manufacturing capability before pushing toward maximum output. Beyond the two-phase timeline, the company has not disclosed additional details about the expansion plan.
The technical backbone of the plant will come from ENcore Systems, a system integration company that Utex has named as its technology partner for the project.
In a statement, Utex said that ENcore Systems "will play a key role as the technology partner in setting up the plant. The partnership will bring together technology and manufacturing expertise to establish the production facility. The focus will be on building a reliable, automated manufacturing setup that supports quality control, production monitoring, and the planned expansion of capacity."
ENcore Systems supplies turnkey production solutions for lithium-ion battery manufacturing, working across both fully automated and semi-automated configurations. Its scope covers cell-to-module and module-to-pack assembly, which frames the range of processes it will support at the Nagpur site.
The announcement was reported on October 12, 2026, and places the new facility among the manufacturing sites emerging within India's battery energy storage sector.
The assembly line at the plant will be fully automated and built around industrial robots supplied by Germany-based KUKA. The line is designed to process battery cells with capacities reaching up to 628 Ah.
Quality assurance at the facility will not be confined to a final gate. The company stated that checks will run across every stage of production, beginning with incoming materials, continuing through in-process inspections, and ending with final product testing.
According to Utex, this regime spans the entire manufacturing workflow rather than being limited to end-of-line verification.
Day-to-day production will be governed by a Manufacturing Execution System integrated with SAP. The company said this setup will deliver real-time visibility into production output, quality, traceability, and operational performance.
By tying shop-floor data to the company's wider enterprise systems, the MES-SAP integration enables continuous monitoring of manufacturing performance throughout the plant. This digital layer sits alongside the automated line and the end-to-end quality checks as one of the operational pillars of the Nagpur facility.
The Nagpur announcement lands during a period of rapid growth projections for India's energy storage market. A report from Rubix Data Sciences projects that the country's battery energy storage system requirement will climb nearly sevenfold to 236 GWh by FY2031-32.
The same report puts the BESS project pipeline at 176.66 GWh and notes that Gujarat and Rajasthan together hold nearly 88 percent of installed utility-scale capacity. Adjacent developments in the wider renewable ecosystem point to rising demand as well.
Tata Power Renewables has reported surpassing 5.67 GW of rooftop solar capacity in India, backed by 575,000 completed rooftop installations spanning residential and commercial and industrial segments.
Meanwhile, the PM Surya Ghar: Muft Bijli Yojana programme has recently crossed the 60 lakh household mark. These figures describe the demand environment against which new manufacturing capacity, such as the 20 GWh plant planned for Nagpur, is being positioned.
Taken together, the elements announced by Utex New Energy define the scope of the project as disclosed: a two-phase build reaching 20 GWh annual capacity from an initial 5.5 GWh, a fully automated line running KUKA robots and handling cells up to 628 Ah, quality checks at every production stage, an MES integrated with SAP for real-time monitoring, and ENcore Systems supplying the technology for lithium-ion battery assembly from cell to module and module to pack.
The company has released no further specifics beyond these points.
Tagged
Also read
Live from the tracker
Capacity, capex, stage, contractors and verified contacts for every project we track, updated daily.